cost-projection
Forward-looking spend extrapolation. Computes a USD-per-day rate from the recent measurement window, projects to 7d/30d/90d/365d horizons, and surfaces "days until budget exhausted" when a budget is configured. Predictive counterpart to `cost-budget-check` (reactive).
How do I install this agent skill?
npx skills add https://github.com/ruvnet/ruflo --skill cost-projectionIs this agent skill safe to install?
- Gen Agent Trust Hubpass
This skill is a financial utility designed to predict future costs based on historical usage records. It performs mathematical extrapolations to estimate spend over various time horizons and checks against a configured budget. The analysis found no evidence of malicious patterns, data exfiltration, or unauthorized code execution.
- Socketpass
No alerts
- Snykpass
Risk: LOW · No issues
What does this agent skill do?
Forward-looking cost projection that pairs with cost-budget-check:
cost-budget-checkanswers "have we crossed the line?" — reactivecost-projectionanswers "when will we cross the line?" — predictive
Algorithm
- Read all
session-*records from thecost-trackingnamespace (same sourcecost-budget-checkuses). - Filter to a measurement window (default last 7 days on
capturedAt/startedAt). - Compute the per-day burn rate:
windowSpend / windowDays. - Linear-extrapolate to each requested horizon (default 7d/30d/90d/365d).
- If a budget is configured (
budget-configkey set bycost-budget set):- Compute "days until 75% / 90% / 100% consumed" at the current rate.
- Surface as a separate table block with
ALREADY REACHEDmarkers for thresholds already exceeded.
Flags
--window <duration> Measurement window. Nh|Nd|Nw|Nm. Default 7d.
--horizons <csv> Projection horizons. Default 7d,30d,90d,365d.
--format table|json Default table (markdown).
Env: PROJECTION_NAMESPACE override (default cost-tracking), PROJECTION_QUIET=1 (alias for --format json).
Smoke transcript (3 sessions × $1 over 7d, $20 budget)
| Sessions in window | 3 |
| Window spend | $3.000000 |
| **USD per day** | **$0.428571** |
| All-time spend | $3.000000 across 3 sessions |
## Projected spend (linear extrapolation)
| Horizon | Days | Projected spend |
|---|---:|---:|
| 7d | 7 | $3.0000 |
| 30d | 30 | $12.8571 |
## Budget exhaustion ($20.00 configured)
| Threshold | Target | Remaining | Time at current rate |
|---|---:|---:|---|
| 75% | $15.00 | $12.00 | 28.0 days |
| 90% | $18.00 | $15.00 | 35.0 days |
| 100% | $20.00 | $17.00 | 39.7 days |
When to use
- Finance / SRE planning: hand the JSON output to a budget dashboard for "are we on track for the quarter?".
- CI gates:
cost-projection --format json | jq '.budget.exhaustion[2].daysUntilReached < 7'→ fail builds when 100% exhaustion is < 1 week away. - Post-workload-shift sanity check: after a big feature lands, re-run to verify the rate hasn't accelerated past expectations.
Stationarity assumption
Linear extrapolation assumes the current rate holds. The footer reminds operators to re-run after workload shifts. For drift detection over MULTIPLE windows, pair with cost-trend (which already covers benchmark-drift).
How can the creator link this skill?
Add the canonical catalog link to the repository README so users can inspect current installs and available audits. The publishing guide covers the complete discovery path.
<a href="https://skillzs.dev/skills/ruvnet/ruflo/cost-projection">View cost-projection on skillZs</a>