ln-523-auto-test-planner
Plans automated tests (E2E/Integration/Unit) using Risk-Based Testing after manual testing. Use when Story needs a test task with prioritized scenarios.
How do I install this agent skill?
npx skills add https://github.com/levnikolaevich/claude-code-skills --skill ln-523-auto-test-plannerIs this agent skill safe to install?
- Gen Agent Trust Hubpass
The skill plans automated tests by analyzing user stories and manual test results. It operates within a managed local runtime environment and delegates tasks to other known local skills. No malicious activity or dangerous data exfiltration patterns were identified.
- Socketpass
No alerts
- Snykpass
Risk: LOW · No issues
- Runlayerpass
1/2 files flagged
- ZeroLeakspass
1 finding · Score: 86/100
What does this agent skill do?
Paths: File paths (
references/,../ln-*) are relative to this skill directory.
Automated Test Planner
Type: L3 Worker
Creates Story test task with comprehensive automated test coverage (E2E/Integration/Unit) based on Risk-Based Testing methodology and REAL manual testing results.
Inputs
| Input | Required | Source | Description |
|---|---|---|---|
storyId | Yes | args, git branch, kanban, user | Story to process |
Resolution: Story Resolution Chain. Status filter: To Review
Purpose & Scope
- Create comprehensive test task for Story automation
- Calculate risk-based priorities (Impact x Probability)
- Generate 11-section test plan from manual test results
- Delegate to ln-301-task-creator (CREATE) or ln-302-task-replanner (REPLAN)
- NOT for: manual testing, research, or orchestration
When to Use
- Use when implementation work is done and automated test coverage must be planned
- All implementation Tasks in Story status = Done
- ln-521 research: uses if available, generates minimal inline research if missing
- ln-522 manual testing: uses if available, marks as 'skipped by policy' if missing
Automation: Supports autoApprove: true in managed runs to skip manual confirmation.
Workflow
Phase 0: Tools Config
MANDATORY READ: Load references/environment_state_contract.md, references/storage_mode_detection.md, and references/input_resolution_pattern.md
Extract: task_provider = Task Management → Provider (linear | file).
Phase 1: Discovery (Automated)
- Resolve storyId: Run Story Resolution Chain per guide (status filter: [To Review]).
- Auto-discover Team ID from
docs/tasks/kanban_board.md(see CLAUDE.md "Configuration Auto-Discovery")
Phase 2: Story + Tasks Analysis (NO Dialog)
Step 0: Study Project Test Files
- Scan for test-related files:
- tests/README.md (commands, setup, environment)
- Test configs (jest.config.js, vitest.config.ts, pytest.ini)
- Existing test structure (tests/, tests/ directories)
- Coverage config (.coveragerc, coverage.json)
- Extract: test commands, framework, patterns, coverage thresholds
- Ensures test planning aligns with project practices
Step 1: Load Research and Manual Test Results
- Fetch Story (must have label "user-story"):
- IF
task_provider=linear:get_issue(storyId)— extract Story.id (UUID, NOT short ID) - IF
task_provider=file:Read story.md— extract Story metadata
- IF
- Load research comment (from ln-521): "## Test Research: {Feature}"
- IF
task_provider=linear:list_comments(issueId=storyId)→ find matching comment - IF
task_provider=file:Glob("docs/tasks/epics/*/stories/*/comments/*.md")→ find matching comment - IF research comment not found: generate 3-5 bullet points of key test areas based on Story AC and task descriptions (inline, no external research).
- IF
- Load manual test results comment (from ln-522): "## Manual Testing Results"
- Same approach as research comment above
- IF manual test results not found: skip manual test coverage analysis. Note in output: 'Manual testing: skipped by policy (simplified mode).'
- Parse sections: AC results (PASS/FAIL), Edge Cases, Error Handling, Integration flows
- Map to test design: PASSED AC -> E2E, Edge cases -> Unit, Errors -> Error handling, Flows -> Integration
Step 2: Analyze Story + Tasks
- Parse Story: Goal, Test Strategy, Technical Notes
- Fetch all child Tasks (status = Done):
- IF
task_provider=linear:list_issues(parentId=Story.id, state="Done") - IF
task_provider=file:Glob("docs/tasks/epics/*/stories/*/tasks/*.md")→ filter by**Status:** Done
- IF
- Analyze each Task:
- Components implemented
- Business logic added
- Integration points created
- Conditional branches (if/else/switch)
- Identify what needs testing
Phase 3: Parsing Strategy for Manual Test Results
Process: Locate Linear comment with "Manual Testing Results" header -> Verify Format Version 1.0 -> Extract structured sections (Acceptance Criteria, Test Results by AC, Edge Cases, Error Handling, Integration Testing) using regex -> Validate (at least 1 PASSED AC, AC count matches Story, completeness check) -> Map parsed data to test design structure
Error Handling: Missing comment -> use fallback (inline research or skip per Phase 2 logic), Missing format version -> WARNING (try legacy parsing), Required section missing -> use fallback, No PASSED AC -> ERROR (fix implementation)
Phase 4: Risk-Based Test Planning (Automated)
MANDATORY READ: Load references/risk_based_testing_guide.md for scoring and usefulness gates.
Conditional read: load references/risk_based_testing_methodology.md only when planning a full test strategy or when the risk/usefulness decision is ambiguous.
E2E-First Approach: Prioritize by business risk (Priority = Impact x Probability), not coverage metrics.
Workflow:
Step 1: Risk Assessment
Calculate Priority for each scenario from manual testing:
Priority = Business Impact (1-5) x Probability (1-5)
Decision Criteria:
- Priority ≥15 -> MUST test
- Priority 9-14 -> SHOULD test if not covered
- Priority <=8 -> SKIP (manual testing sufficient)
Step 2: E2E Test Selection (2-5): Baseline 2 (positive + negative) ALWAYS + 0-3 additional (Priority ≥15 only)
Step 3: Unit Test Selection (0-15): DEFAULT 0. Add ONLY for complex business logic (Priority ≥15): financial, security, algorithms
Step 4: Integration Test Selection: DEFAULT 0. Add ONLY if E2E gaps AND Priority ≥15: rollback, concurrency, external API errors
Step 5: Validation: Each test passes Usefulness Criteria (Priority ≥15, Confidence ROI, Behavioral, Predictive, Specific, Non-Duplicative)
Phase 5: Test Task Generation (Automated)
Generates complete test task per test_task_template.md (11 sections):
Sections 1-7: Context, Risk Matrix, E2E/Integration/Unit Tests (with Priority scores + justifications), Coverage, DoD
Section 8: Existing Tests to Fix (analysis of affected tests from implementation tasks)
Section 9: Infrastructure Changes (packages, Docker, configs - based on test dependencies)
Section 10: Documentation Updates (README, CHANGELOG, tests/README, config docs)
Section 11: Legacy Code Cleanup (unsupported patterns, backward compat, dead code)
Shows preview for review.
Phase 6: Confirmation & Delegation
Step 1: Preview generated test plan (always displayed for transparency)
Step 2: Confirmation logic:
- autoApprove: true -> proceed automatically
- Manual run -> prompt user to type "confirm"
Step 3: Check for existing test task
- IF
task_provider=linear:list_issues(parentId=Story.id, label="tests") - IF
task_provider=file:Glob("docs/tasks/epics/*/stories/*/tasks/*.md")→ filter by**Labels:**containingtests
Decision:
- Count = 0 -> CREATE MODE (Step 4a)
- Count >= 1 -> REPLAN MODE (Step 4b)
Step 4a: CREATE MODE (if Count = 0)
Managed delegation sequence:
- Compute
childRunId = {parent_run_id}--ln-301--{storyId} - Compute
childSummaryArtifactPath = .hex-skills/runtime-artifacts/runs/{parent_run_id}/task-plan/ln-301--{storyId}.json - Materialize child manifest at
.hex-skills/test-planning/ln-301--{storyId}_manifest.json - Start
task-plan-worker-runtimewith both transport inputs - Checkpoint
child_runmetadata inPHASE_6_DELEGATE_TASK_PLAN - Invoke
ln-301-task-creatorwith--run-idand--summary-artifact-path - Read only the resulting child
task-planartifact
Pass to worker:
- taskType, teamId, storyData (Story.id, title, AC, Technical Notes, Context)
- researchFindings (from ln-521 comment)
- manualTestResults (from ln-522 comment)
- testPlan (e2eTests, integrationTests, unitTests, riskPriorityMatrix)
- infrastructureChanges, documentationUpdates, legacyCleanup
Worker returns: Task URL + task-plan artifact
Step 4b: REPLAN MODE (if Count >= 1)
Managed delegation sequence:
- Compute
childRunId = {parent_run_id}--ln-302--{storyId} - Compute
childSummaryArtifactPath = .hex-skills/runtime-artifacts/runs/{parent_run_id}/task-plan/ln-302--{storyId}.json - Materialize child manifest at
.hex-skills/test-planning/ln-302--{storyId}_manifest.json - Start
task-plan-worker-runtimewith both transport inputs - Checkpoint
child_runmetadata inPHASE_6_DELEGATE_TASK_PLAN - Invoke
ln-302-task-replannerwith--run-idand--summary-artifact-path - Read only the resulting child
task-planartifact
Pass to worker:
- Same data as CREATE MODE + existingTaskIds
Worker returns: Operations summary + child task-plan artifact
Step 5: Return structured summary to caller
Runtime Summary Artifact
MANDATORY READ: Load references/test_planning_summary_contract.md, references/test_planning_worker_runtime_contract.md, references/task_plan_worker_runtime_contract.md
Runtime profile:
- family:
test-planning-worker - worker:
ln-523 - summary kind:
test-planning-worker - payload fields used by coordinators:
worker,status,warnings,test_task_id,test_task_url,coverage_summary,planned_scenarios
Invocation rules:
- standalone: omit
runIdandsummaryArtifactPath - managed: pass both
runIdand exactsummaryArtifactPath - always write the validated summary before terminal outcome
Delegated child worker rules:
- when delegating to
ln-301orln-302,ln-523becomes the parent runtime - start
task-plan-worker-runtimebefore delegation - checkpoint
child_runmetadata before the child Skill call - consume only the child
task-planartifact, never child prose
Definition of Done
Research and Manual Results Loaded:
- Research comment "## Test Research: {Feature}" found (from ln-521)
- Manual test results "## Manual Testing Results" found (from ln-522)
- At least 1 AC marked as PASSED
Risk-Based Test Plan Generated:
- Risk Priority Matrix calculated for all scenarios
- E2E tests: Baseline positive + negative, additional only if Priority ≥15
- Integration tests: ONLY if E2E doesn't cover AND Priority ≥15
- Unit tests: ONLY complex business logic with Priority ≥15
- Each test passes all 6 Usefulness Criteria
- No framework/library testing: Each test validates OUR business logic only
Test Task Description Complete (11 sections):
- All 11 sections populated per template
- Risk Priority Matrix included
- Each test beyond baseline 2 justified
Worker Delegation Executed:
- CREATE MODE: Delegated to ln-301-task-creator through
task-plan-worker-runtime - REPLAN MODE: Delegated to ln-302-task-replanner through
task-plan-worker-runtime - Child run metadata checkpointed before delegation
- Child
task-planartifact consumed before final summary - Tracker Issue/Story URL returned
Output:
- CREATE MODE: Tracker Issue/Story URL + confirmation
- REPLAN MODE: Operations summary + URLs
Reference Files
- Environment state:
references/environment_state_contract.md - Storage mode operations:
references/storage_mode_detection.md - Risk-based testing contract:
references/risk_based_testing_guide.md - Optional methodology catalog:
references/risk_based_testing_methodology.md - Auto-discovery patterns:
references/auto_discovery_pattern.md - Test task template:
references/templates/test_task_template.md(workers ln-301/ln-302 load via Template Loading) - Testing examples:
references/risk_based_testing_examples.md - MANDATORY READ: Load
references/research_tool_fallback.md
Critical Rules
- Manual results preferred: Use ln-522 manual testing results when available. When missing (simplified mode), generate minimal inline research and mark manual testing as skipped
- E2E-first, not unit-first: Baseline is always 2 E2E (positive + negative); unit/integration added only for Priority >= 15
- No framework testing: Every test must validate OUR business logic; never test library/framework behavior
- Usefulness enforcement: Every test beyond baseline must pass all 6 Usefulness Criteria (see risk_based_testing_guide.md)
- Delegate, don't create: Task creation goes through ln-301/ln-302 workers; this skill generates the plan only
- Managed child runs only: Parent-child delegation to ln-301/ln-302 must use
task-plan-worker-runtime, deterministic childrunId, exact childsummaryArtifactPath, and artifact-only consumption
Best Practices
Minimum Viable Testing: Start with baseline E2E (positive + negative). Each additional test must pass all 6 Usefulness Criteria.
Risk-Based Testing: Prioritize by Business Impact x Probability. E2E-first from ACTUAL manual testing results. Priority ≥15 scenarios covered by tests.
Expected-Based Testing: For deterministic tests, compare actual vs expected using diff. MANDATORY READ: Load ../ln-522-manual-tester/SKILL.md — section "Test Design Principles".
Version: 1.0.0 Last Updated: 2026-01-15
How can the creator link this skill?
Add the canonical catalog link to the repository README so users can inspect current installs and available audits. The publishing guide covers the complete discovery path.
<a href="https://skillzs.dev/skills/levnikolaevich/claude-code-skills/ln-523-auto-test-planner">View ln-523-auto-test-planner on skillZs</a>