skillZs
★ LIVE SKILL TAGS ★
>>> LIVE SKILLS INDEX <<<
* OPEN SOURCE *
NO LOGIN, NO TRACKING
※ REAL INSTALL DATA ※
← back to all skills
eljun/claude-workflow-skills80 installs

ship

Use this skill after documentation is complete and the task is approved. Runs pre-ship checks, prepares a branch or pull request, updates TASKS.md, and leaves release timing to the release stage.

How do I install this agent skill?

npx skills add https://github.com/eljun/claude-workflow-skills --skill ship
view source ↗

Is this agent skill safe to install?

  • Gen Agent Trust Hubpass

    The skill facilitates the pull request workflow and task status management. While functionally safe, it has a common attack surface for indirect prompt injection because it reads and processes external project files to execute build scripts and generate pull request descriptions.

  • Socketpass

    No alerts

  • Snykpass

    Risk: LOW · No issues

What does this agent skill do?

ship - Pull Request Stage

Invariants

  • Always advance the task to Ready To Ship in TASKS.md and re-read the tracker to confirm the row moved before handoff. A stale tracker blocks downstream and headless sessions.
  • Self-heal when intermediate stages were skipped: never abort because the task is not in Approved. Detect the current section, record a Skipped Stages list, and disclose it in the PR body and handoff text.
  • Run available pre-ship checks before creating a pull request.
  • Do not auto-merge.
  • Keep released-version work for the release stage.

Runtime adapters may expose this stage as a slash command, menu action, or natural-language skill invocation. The portable stage name is ship.

Workflow

  1. Read AGENTS.md.
  2. Resolve the task ID and read the task document.
  3. Compute Skipped Stages by checking for durable artifacts (see table below). Do not infer skipped stages from the current TASKS.md section — the tracker is exactly what goes stale, so trusting it would re-introduce the bug.
  4. Pre-ship checks are still useful; missing artifacts do not block ship, only get disclosed.
  5. Run pre-ship checks documented by the project or task.
  6. Review changed files for unintended edits and secrets.
  7. Compute the operator steps from the diff (see below). Don't copy them from the task doc.
  8. Create or reuse an appropriate branch.
  9. Create a pull request with links to the task document, test report, the Skipped Stages disclosure and the Operator Steps.
  10. Move the task to Ready To Ship in TASKS.md, removing the row from whichever prior section it currently sits in.
  11. Re-read TASKS.md and verify the task row is now under Ready To Ship and absent from prior sections. If the row is not in the expected section, the move was missed, so make the edit now before handoff.

(This is a verification against the model forgetting the step, not against Edit failing. The check is cheap and catches the most common cause of stale trackers.)

Skipped Stages Detection

Detect from durable artifacts, not from tracker section. The tracker may be stale; the artifacts are the ground truth.

StageCounts as "ran" when this artifact exists
implementtask doc contains an Implementation Notes section
simplifytask doc contains a Quality Gate Notes section with Result: PASS or FAIL
testdocs/testing/{ID}-{task-name}.md exists
documentdocs/learnings/{ID}-{task-name}.md exists, or feature/guide docs were updated for this task

A stage with no artifact is "skipped". List skipped stages in the PR body and handoff.

Operator Steps (computed)

If merging doesn't by itself apply the change (separately deployed functions, services or workers; migrations; config), derive what must happen from the diff:

  • Deploys: for each deployable entry point, check whether the diff changes it or any module it imports, transitively. A change to a shared module reaches every deployable that imports it; list them all, not only the obvious one.
  • Already live? If the project lets you check deployed state read-only (deploy timestamps or versions vs the last commit that reaches each deployable), report each one as deployed or "needs deploy".
  • Migrations / config / data: list them in apply order. Mark data writes as owner-run when the project requires that.

Put the result in the PR body. When nothing is needed, write "None: merge is enough".

Pre-Ship Checks

Run available project checks, such as:

pnpm build
pnpm typecheck
pnpm lint
pnpm test

Use the commands that exist in the target project. If a command is unavailable, record that it was skipped and why.

Pull Request Body

## Summary

- {Change summary}

## Verification

- {Command or report}

## Skipped Stages

- {Comma-separated list, or "None"}

## Operator Steps

- {Computed deploys (with already-live status if checkable), migrations, config; or "None: merge is enough"}

## Post-Deploy Checks

- {Each `post-deploy` acceptance check and `Deferred` test check: the exact command/query and the expected result, or "None"}

## Workflow References

- Task: docs/task/{ID}-{task-name}.md
- Test report: docs/testing/{ID}-{task-name}.md or N/A
- Feature docs: {path or N/A}

Handoff

Ship preparation complete for task {ID}
Task status: Ready To Ship (verified in TASKS.md)
Skipped stages: {list or "None"}
PR: {url}
Post-deploy checks pending: {count, listed in the PR, or "None"}
Next stage after merge (and deploy): run the post-deploy checks, then release

Add the canonical catalog link to the repository README so users can inspect current installs and available audits. The publishing guide covers the complete discovery path.

<a href="https://skillzs.dev/skills/eljun/claude-workflow-skills/ship">View ship on skillZs</a>