datadrivenconstruction/ddc_skills_for_ai_agents_in_construction50 installs
oce-estimate-boq
Create bills of quantities and estimates in OpenConstructionERP: search cost items, build BOQ sections, link BIM elements in bulk, validate the BOQ, and export GAEB/XLSX/JSON. Use for any estimating workflow on the platform.
How do I install this agent skill?
npx skills add https://github.com/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction --skill oce-estimate-boqIs this agent skill safe to install?
- Gen Agent Trust Hubpass
This skill is a documentation and workflow guide for the OpenConstructionERP platform. It contains instructions for managing bills of quantities (BOQ), estimating costs, and using specific API endpoints. There are no executable scripts, external dependencies, or security risks identified in the content.
- Socketpass
No alerts
- Snykpass
Risk: LOW · No issues
What does this agent skill do?
BOQ & Estimation in OpenConstructionERP
Workflow
- Pick a cost base — load it (see
oce-load-cost-bases) so items are searchable. - Create the BOQ —
POST /api/v1/boqswith project, currency, classification standard (DIN 276 / NRM / MasterFormat / regional). - Find items —
GET /api/v1/costs/?region=TR_NATIONAL&q=duvar(SQL search) or the semantic path (/qdrant-searchwhen Qdrant is on). Every item carries acomponents[]breakdown (labour/material/machine with norm quantities and unit prices). - Link quantities — either manual entry, BIM bulk-link (
POST /api/v1/bim/elements/bulk-linkstyle endpoints aggregate area/volume/length per element), or PDF/DWG takeoff measurements. - Validate —
POST /api/v1/boqs/{id}/validate/runs rule packs (BOQ quality, DIN276, NRM, GAEB) and returns violations; quality score updates live. - Export — GAEB X83/X84, XLSX, JSON for tendering.
Cost item anatomy (what the platform stores per item)
{
"code": "15.115.1008",
"description": "El veya kompresörle ... yumuşak kaya kazılması",
"unit": "m³",
"rate": 1044.5,
"currency": "TRY",
"classification": {"collection":"İnşaat","department":"İnşaat","section":"15.115","category":"CONSTRUCTION WORK"},
"components": [
{"name":"Kompresör","type":"equipment","quantity":0.2,"unit_rate":1991.73,"cost":398.35},
{"name":"Düz işçi","type":"labor","quantity":1.25,"unit_rate":165.0,"cost":206.25}
],
"metadata": {"labor_cost":437.25,"equipment_cost":398.35,"labor_hours":3.83}
}
Estimation inputs the platform supports
| Input | Path | Notes |
|---|---|---|
| Natural language | POST /api/v1/costs/match (or AI estimate) | multi-lingual matching |
| Photo | AI photo-to-BOQ (GPT-4o + YOLO) | returns scoped BOQ with confidence |
| BIM model | element → cost matching (/suggest-for-element) | uses volume/area from the model |
| DWG/PDF | takeoff measurement | vectors/rooms detected, pushed into BOQ |
Pricing notes (honest rules)
- National bases are priced in their home currency; markets are PPP-repriced upstream (no FX inside the platform).
- Coefficient bases (Vietnam Dinh Muc, Indonesia AHSP) import with
rate = 0— attach a market resource price sheet before estimating. - Turkey positions carry the source book's markup (e.g. 25% contractor profit) inside
total_cost_per_position; resource sums reconcile tototal_resource_cost_per_position.
Best practices
- Always verify
unitmatches your takeoff quantity (m²/m³/m/kg). - Check the
components[]sum againstratebefore committing a binding estimate. - Keep the region currency on the BOQ; never blend currencies in one total.
- Re-run validation after every bulk edit — the quality score is the fastest signal.
How can the creator link this skill?
Add the canonical catalog link to the repository README so users can inspect current installs and available audits. The publishing guide covers the complete discovery path.
<a href="https://skillzs.dev/skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/oce-estimate-boq">View oce-estimate-boq on skillZs</a>