change-order-analysis
Analyze and predict construction change orders using ML. Classify change order types, predict costs and schedule impacts, identify patterns, and optimize approval workflows.
How do I install this agent skill?
npx skills add https://github.com/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction --skill change-order-analysisIs this agent skill safe to install?
- Gen Agent Trust Hubpass
The skill uses the joblib library to load machine learning models from the filesystem. This involves deserializing data using pickle, which can lead to arbitrary code execution if a malicious model file is processed. It also performs filesystem write operations for exporting reports and saving models.
- Socketpass
No alerts
- Snykpass
Risk: LOW · No issues
- ZeroLeakspass
Score: 93/100 · 2 sections analyzed
What does this agent skill do?
Change Order Analysis
Overview
This skill implements machine learning-based change order analysis for construction projects. Predict change order costs, classify types, identify patterns in historical data, and streamline approval processes.
Capabilities:
- Change order classification
- Cost impact prediction
- Schedule impact analysis
- Pattern identification
- Root cause analysis
- Approval workflow optimization
Quick Start
from dataclasses import dataclass, field
from datetime import date, datetime
from typing import List, Dict, Optional
from enum import Enum
class ChangeOrderType(Enum):
DESIGN_CHANGE = "design_change"
OWNER_REQUEST = "owner_request"
FIELD_CONDITION = "field_condition"
CODE_COMPLIANCE = "code_compliance"
VALUE_ENGINEERING = "value_engineering"
ERROR_OMISSION = "error_omission"
SCOPE_CHANGE = "scope_change"
class ChangeOrderStatus(Enum):
DRAFT = "draft"
SUBMITTED = "submitted"
UNDER_REVIEW = "under_review"
APPROVED = "approved"
REJECTED = "rejected"
IMPLEMENTED = "implemented"
@dataclass
class ChangeOrder:
co_number: str
title: str
description: str
co_type: ChangeOrderType
status: ChangeOrderStatus
submitted_date: date
requested_by: str
cost_impact: float
schedule_impact_days: int
affected_elements: List[str] = field(default_factory=list)
def classify_change_order(description: str) -> ChangeOrderType:
"""Simple rule-based classification"""
description_lower = description.lower()
if any(word in description_lower for word in ['design', 'drawing', 'specification']):
return ChangeOrderType.DESIGN_CHANGE
elif any(word in description_lower for word in ['owner', 'client', 'request']):
return ChangeOrderType.OWNER_REQUEST
elif any(word in description_lower for word in ['site', 'field', 'condition', 'unforeseen']):
return ChangeOrderType.FIELD_CONDITION
elif any(word in description_lower for word in ['code', 'regulation', 'compliance']):
return ChangeOrderType.CODE_COMPLIANCE
elif any(word in description_lower for word in ['value', 'alternative', 'savings']):
return ChangeOrderType.VALUE_ENGINEERING
elif any(word in description_lower for word in ['error', 'omission', 'mistake']):
return ChangeOrderType.ERROR_OMISSION
else:
return ChangeOrderType.SCOPE_CHANGE
# Example
co = ChangeOrder(
co_number="CO-001",
title="Additional structural reinforcement",
description="Site conditions revealed weaker soil requiring additional foundation reinforcement",
co_type=classify_change_order("Site conditions revealed weaker soil"),
status=ChangeOrderStatus.SUBMITTED,
submitted_date=date.today(),
requested_by="Site Engineer",
cost_impact=50000,
schedule_impact_days=5
)
print(f"CO Type: {co.co_type.value}")
Comprehensive Change Order System
Change Order Management
from dataclasses import dataclass, field
from datetime import date, datetime, timedelta
from typing import List, Dict, Optional, Tuple
from enum import Enum
import pandas as pd
import numpy as np
class ImpactSeverity(Enum):
MINOR = "minor" # < 1% cost, < 1 week schedule
MODERATE = "moderate" # 1-5% cost, 1-4 weeks schedule
MAJOR = "major" # 5-10% cost, 1-3 months schedule
CRITICAL = "critical" # > 10% cost, > 3 months schedule
@dataclass
class CostBreakdown:
labor: float = 0
materials: float = 0
equipment: float = 0
subcontractor: float = 0
overhead: float = 0
profit: float = 0
@property
def total(self) -> float:
return self.labor + self.materials + self.equipment + self.subcontractor + self.overhead + self.profit
@dataclass
class ScheduleImpact:
direct_days: int
ripple_days: int
critical_path_affected: bool
affected_activities: List[str] = field(default_factory=list)
@property
def total_days(self) -> int:
return self.direct_days + self.ripple_days
@dataclass
class ChangeOrderDetail:
co_id: str
co_number: str
title: str
description: str
justification: str
# Classification
co_type: ChangeOrderType
initiated_by: str # owner, contractor, designer, etc.
responsibility: str # who pays
# Status
status: ChangeOrderStatus
submitted_date: date
approved_date: Optional[date] = None
implemented_date: Optional[date] = None
# Impact
cost_breakdown: CostBreakdown = field(default_factory=CostBreakdown)
schedule_impact: ScheduleImpact = None
severity: ImpactSeverity = ImpactSeverity.MINOR
# Affected scope
affected_elements: List[str] = field(default_factory=list)
affected_drawings: List[str] = field(default_factory=list)
affected_specs: List[str] = field(default_factory=list)
# Supporting documents
attachments: List[str] = field(default_factory=list)
related_rfis: List[str] = field(default_factory=list)
related_cos: List[str] = field(default_factory=list)
# Approval
approvals: List[Dict] = field(default_factory=list)
comments: List[Dict] = field(default_factory=list)
class ChangeOrderManager:
"""Manage project change orders"""
def __init__(self, project_id: str, contract_value: float):
self.project_id = project_id
self.contract_value = contract_value
self.change_orders: Dict[str, ChangeOrderDetail] = {}
self.co_counter = 0
def create_change_order(self, title: str, description: str,
co_type: ChangeOrderType,
initiated_by: str) -> ChangeOrderDetail:
"""Create new change order"""
self.co_counter += 1
co_id = f"CO-{self.project_id}-{self.co_counter:04d}"
co = ChangeOrderDetail(
co_id=co_id,
co_number=f"CO-{self.co_counter:04d}",
title=title,
description=description,
justification="",
co_type=co_type,
initiated_by=initiated_by,
responsibility="TBD",
status=ChangeOrderStatus.DRAFT,
submitted_date=date.today()
)
self.change_orders[co_id] = co
return co
def update_cost(self, co_id: str, cost_breakdown: CostBreakdown):
"""Update change order cost"""
co = self.change_orders.get(co_id)
if co:
co.cost_breakdown = cost_breakdown
co.severity = self._calculate_severity(co)
def update_schedule_impact(self, co_id: str, impact: ScheduleImpact):
"""Update schedule impact"""
co = self.change_orders.get(co_id)
if co:
co.schedule_impact = impact
co.severity = self._calculate_severity(co)
def _calculate_severity(self, co: ChangeOrderDetail) -> ImpactSeverity:
"""Calculate change order severity"""
cost_pct = co.cost_breakdown.total / self.contract_value * 100
schedule_days = co.schedule_impact.total_days if co.schedule_impact else 0
if cost_pct > 10 or schedule_days > 90:
return ImpactSeverity.CRITICAL
elif cost_pct > 5 or schedule_days > 30:
return ImpactSeverity.MAJOR
elif cost_pct > 1 or schedule_days > 7:
return ImpactSeverity.MODERATE
else:
return ImpactSeverity.MINOR
def submit_for_approval(self, co_id: str):
"""Submit change order for approval"""
co = self.change_orders.get(co_id)
if co and co.status == ChangeOrderStatus.DRAFT:
co.status = ChangeOrderStatus.SUBMITTED
co.submitted_date = date.today()
def approve(self, co_id: str, approver: str, comments: str = ""):
"""Approve change order"""
co = self.change_orders.get(co_id)
if co:
co.approvals.append({
'approver': approver,
'action': 'approved',
'date': date.today().isoformat(),
'comments': comments
})
co.status = ChangeOrderStatus.APPROVED
co.approved_date = date.today()
def get_summary(self) -> Dict:
"""Get change order summary"""
if not self.change_orders:
return {'message': 'No change orders'}
total_cost = sum(co.cost_breakdown.total for co in self.change_orders.values())
total_schedule = sum(
co.schedule_impact.total_days if co.schedule_impact else 0
for co in self.change_orders.values()
)
by_type = {}
by_status = {}
by_severity = {}
for co in self.change_orders.values():
t = co.co_type.value
by_type[t] = by_type.get(t, 0) + co.cost_breakdown.total
s = co.status.value
by_status[s] = by_status.get(s, 0) + 1
sev = co.severity.value
by_severity[sev] = by_severity.get(sev, 0) + 1
return {
'total_change_orders': len(self.change_orders),
'total_cost_impact': total_cost,
'cost_impact_pct': total_cost / self.contract_value * 100,
'total_schedule_impact_days': total_schedule,
'by_type': by_type,
'by_status': by_status,
'by_severity': by_severity
}
ML Classification and Prediction
from sklearn.ensemble import RandomForestClassifier, GradientBoostingRegressor
from sklearn.feature_extraction.text import TfidfVectorizer
from sklearn.model_selection import train_test_split
from sklearn.preprocessing import LabelEncoder
import pandas as pd
import numpy as np
import joblib
class ChangeOrderPredictor:
"""ML-based change order classification and cost prediction"""
def __init__(self):
self.type_classifier = None
self.cost_predictor = None
self.schedule_predictor = None
self.vectorizer = TfidfVectorizer(max_features=500, ngram_range=(1, 2))
self.type_encoder = LabelEncoder()
self.is_trained = False
def train(self, historical_data: pd.DataFrame):
"""Train models on historical change order data
Expected columns:
- description: text description
- co_type: change order type
- cost_impact: cost in dollars
- schedule_impact: days of delay
- contract_value: original contract value
- project_phase: phase when CO was raised
- affected_elements_count: number of affected elements
"""
# Prepare text features
text_features = self.vectorizer.fit_transform(historical_data['description'])
# Prepare numeric features
numeric_features = historical_data[[
'contract_value', 'affected_elements_count'
]].values
# Combine features
X = np.hstack([text_features.toarray(), numeric_features])
# Train type classifier
y_type = self.type_encoder.fit_transform(historical_data['co_type'])
X_train, X_test, y_train, y_test = train_test_split(X, y_type, test_size=0.2)
self.type_classifier = RandomForestClassifier(n_estimators=100, random_state=42)
self.type_classifier.fit(X_train, y_train)
type_accuracy = self.type_classifier.score(X_test, y_test)
# Train cost predictor
y_cost = historical_data['cost_impact'].values
self.cost_predictor = GradientBoostingRegressor(n_estimators=100, random_state=42)
self.cost_predictor.fit(X, y_cost)
# Train schedule predictor
y_schedule = historical_data['schedule_impact'].values
self.schedule_predictor = GradientBoostingRegressor(n_estimators=100, random_state=42)
self.schedule_predictor.fit(X, y_schedule)
self.is_trained = True
return {
'type_classifier_accuracy': type_accuracy,
'models_trained': True
}
def predict(self, description: str, contract_value: float,
affected_elements_count: int = 1) -> Dict:
"""Predict change order type and impacts"""
if not self.is_trained:
return {'error': 'Models not trained'}
# Prepare features
text_features = self.vectorizer.transform([description])
numeric_features = np.array([[contract_value, affected_elements_count]])
X = np.hstack([text_features.toarray(), numeric_features])
# Predict type
type_probs = self.type_classifier.predict_proba(X)[0]
type_idx = np.argmax(type_probs)
predicted_type = self.type_encoder.inverse_transform([type_idx])[0]
# Predict cost
predicted_cost = self.cost_predictor.predict(X)[0]
# Predict schedule
predicted_schedule = self.schedule_predictor.predict(X)[0]
return {
'predicted_type': predicted_type,
'type_confidence': float(type_probs[type_idx]),
'type_probabilities': {
self.type_encoder.inverse_transform([i])[0]: float(p)
for i, p in enumerate(type_probs)
},
'predicted_cost': float(max(0, predicted_cost)),
'predicted_schedule_days': int(max(0, predicted_schedule)),
'cost_as_pct_contract': float(predicted_cost / contract_value * 100)
}
def save_models(self, path: str):
"""Save trained models"""
joblib.dump({
'type_classifier': self.type_classifier,
'cost_predictor': self.cost_predictor,
'schedule_predictor': self.schedule_predictor,
'vectorizer': self.vectorizer,
'type_encoder': self.type_encoder
}, path)
def load_models(self, path: str):
"""Load trained models"""
data = joblib.load(path)
self.type_classifier = data['type_classifier']
self.cost_predictor = data['cost_predictor']
self.schedule_predictor = data['schedule_predictor']
self.vectorizer = data['vectorizer']
self.type_encoder = data['type_encoder']
self.is_trained = True
Pattern Analysis
from collections import defaultdict
from typing import List, Dict
import pandas as pd
class ChangeOrderAnalyzer:
"""Analyze patterns in change orders"""
def __init__(self, change_orders: List[ChangeOrderDetail]):
self.cos = change_orders
self.df = self._to_dataframe()
def _to_dataframe(self) -> pd.DataFrame:
"""Convert change orders to DataFrame"""
data = []
for co in self.cos:
data.append({
'co_id': co.co_id,
'co_type': co.co_type.value,
'initiated_by': co.initiated_by,
'cost': co.cost_breakdown.total,
'schedule_days': co.schedule_impact.total_days if co.schedule_impact else 0,
'submitted_date': co.submitted_date,
'affected_elements': len(co.affected_elements),
'severity': co.severity.value
})
return pd.DataFrame(data)
def analyze_by_type(self) -> Dict:
"""Analyze change orders by type"""
if self.df.empty:
return {}
analysis = {}
for co_type in self.df['co_type'].unique():
type_df = self.df[self.df['co_type'] == co_type]
analysis[co_type] = {
'count': len(type_df),
'total_cost': type_df['cost'].sum(),
'avg_cost': type_df['cost'].mean(),
'total_schedule_days': type_df['schedule_days'].sum(),
'avg_schedule_days': type_df['schedule_days'].mean()
}
return analysis
def analyze_trends(self) -> Dict:
"""Analyze trends over time"""
if self.df.empty:
return {}
self.df['month'] = pd.to_datetime(self.df['submitted_date']).dt.to_period('M')
monthly = self.df.groupby('month').agg({
'co_id': 'count',
'cost': 'sum',
'schedule_days': 'sum'
}).rename(columns={'co_id': 'count'})
return {
'monthly_trend': monthly.to_dict(),
'peak_month': monthly['count'].idxmax().strftime('%Y-%m'),
'total_cost_trend': 'increasing' if monthly['cost'].is_monotonic_increasing else
'decreasing' if monthly['cost'].is_monotonic_decreasing else 'variable'
}
def identify_root_causes(self) -> List[Dict]:
"""Identify common root causes"""
if self.df.empty:
return []
# Analyze by initiator and type combination
causes = self.df.groupby(['initiated_by', 'co_type']).agg({
'co_id': 'count',
'cost': 'sum'
}).reset_index()
causes = causes.sort_values('cost', ascending=False)
return [
{
'initiator': row['initiated_by'],
'type': row['co_type'],
'frequency': row['co_id'],
'total_cost': row['cost'],
'recommendation': self._get_recommendation(row['initiated_by'], row['co_type'])
}
for _, row in causes.head(10).iterrows()
]
def _get_recommendation(self, initiator: str, co_type: str) -> str:
"""Generate recommendation based on pattern"""
recommendations = {
('designer', 'design_change'): 'Improve design review process and BIM coordination',
('designer', 'error_omission'): 'Implement design quality checks and clash detection',
('owner', 'owner_request'): 'Define scope more clearly during planning phase',
('owner', 'scope_change'): 'Conduct thorough requirements gathering',
('contractor', 'field_condition'): 'Enhance site investigation before construction',
('contractor', 'value_engineering'): 'Include VE sessions earlier in project'
}
return recommendations.get(
(initiator.lower(), co_type),
'Review process and implement preventive measures'
)
def calculate_risk_score(self) -> float:
"""Calculate overall change order risk score"""
if self.df.empty:
return 0
# Factors:
# - Frequency of COs
# - Cost impact severity
# - Schedule impact severity
# - Trend direction
co_rate = len(self.df) / 12 # COs per month (assuming 12 month project)
avg_cost_impact = self.df['cost'].mean()
avg_schedule_impact = self.df['schedule_days'].mean()
# Normalize and weight
freq_score = min(1, co_rate / 10) * 30 # Up to 30 points
cost_score = min(1, avg_cost_impact / 50000) * 40 # Up to 40 points
schedule_score = min(1, avg_schedule_impact / 30) * 30 # Up to 30 points
return freq_score + cost_score + schedule_score
def generate_report(self, output_path: str) -> str:
"""Generate comprehensive analysis report"""
with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
# Summary
summary = pd.DataFrame([{
'Total COs': len(self.cos),
'Total Cost Impact': self.df['cost'].sum(),
'Total Schedule Impact (days)': self.df['schedule_days'].sum(),
'Risk Score': self.calculate_risk_score()
}])
summary.to_excel(writer, sheet_name='Summary', index=False)
# By type
pd.DataFrame(self.analyze_by_type()).T.to_excel(
writer, sheet_name='By_Type'
)
# Root causes
pd.DataFrame(self.identify_root_causes()).to_excel(
writer, sheet_name='Root_Causes', index=False
)
# All COs
self.df.to_excel(writer, sheet_name='All_COs', index=False)
return output_path
Quick Reference
| CO Type | Typical Cause | Prevention Strategy |
|---|---|---|
| Design Change | Incomplete design | BIM coordination, design reviews |
| Owner Request | Changing requirements | Clear scope definition |
| Field Condition | Unforeseen site issues | Thorough site investigation |
| Code Compliance | Regulation changes | Early code review |
| Value Engineering | Cost savings opportunity | VE workshops |
| Error/Omission | Design mistakes | QA/QC processes |
Resources
- AIA A201: General Conditions of the Contract
- AGC ConsensusDocs: Change order management
- DDC Website: https://datadrivenconstruction.io
Next Steps
- See
document-classification-nlpfor CO document processing - See
risk-assessment-mlfor project risk analysis - See
cost-predictionfor cost estimation
How can the creator link this skill?
Add the canonical catalog link to the repository README so users can inspect current installs and available audits. The publishing guide covers the complete discovery path.
<a href="https://skillzs.dev/skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/change-order-analysis">View change-order-analysis on skillZs</a>